In the interest of the safety of cyclists and spectators, crossing the track right before the start is not allowed. This has a significant negative effect on the flow of pedestrians. As the bridges had to be constructed in the city centre simultaneously with the other preparations for the event, it was essential that they were installed quickly using our special installation method. Installation took place Friday evening and night and by early Sunday morning, everything had been removed again. Since the bridges were constructed on the track, obstructing the city centre roads that had to be crossed for more than ten minutes was not allowed, in order to prevent hindrance to other suppliers.