At EventBridge, preparation for your project starts long before the bridge arrives on site. In fact, a significant part of that preparation was already completed in 2014, when our modular bridge system was approved by TÜV. The system is designed for a service life of 50 years. During that period, the bridges can be installed and removed up to 20 times per year, or alternatively remain in place on a long-term basis.
Our working method results in a heavy-duty and highly stable bridge structure that has been designed with efficiency in mind from the very beginning. This allows us to combine a high level of quality and safety with attractive overall project costs. Based on your requirements, we assess the best way to integrate the EventBridge at your location—with as little disruption as possible and, of course, in accordance with all applicable requirements.
A temporary pedestrian bridge affects several aspects of a project, including permits, traffic measures, safety and site layout. We have been working throughout Europe for over 10 years and know both the capabilities of the EventBridge system and the different ways in which our bridges can be integrated into a project. We are happy to share this experience with you.
So how do we proceed? First, we assess the general possibilities based on your preferred location. If the proposed solution and costs meet your expectations, a site visit can be scheduled. Based on this visit, we then prepare a final installation proposal. For recurring projects, we carry out such site visits free of charge. A preliminary site inspection by our team is always without obligation, and the final decision is, of course, yours.
The EventBridge system can be used in a variety of configurations and offers flexibility within clearly defined limits. All approved configurations are already covered by the design manual, which means that the same verified technical basis can be used for every project. The design manual was developed in collaboration with the highly regarded Dutch engineering firm Movares. In addition, both the production process and the supporting documentation have been inspected by TÜV NORD Germany. For you, this means that the technical documentation is already in place before the project begins. This provides greater certainty during the preparation phase and can also help support the permitting process.