Crane hoisting the temporary EventBridge pedestrian bridge into place.

Traffic disruption kept to a minimum

Our installation method allows us to significantly reduce traffic disruption. Detours and road closures not only involve additional costs, but also affect traffic, local residents, businesses and emergency services. Especially on busy roads or in inner-city locations, it is important to keep this disruption to an absolute minimum. The EventBridge system offers a major advantage in this respect, mainly thanks to its short installation times. Whenever conditions allow, we even assemble the complete bridge right next to the road. This means that most of the work can be carried out away from live traffic.

Installation in Just a Few Minutes

An EventBridge can be fully assembled—including the supports and stairs—at the required height and then lifted and moved as a complete unit. This means that the fully assembled bridge can be placed in its final position with just one crane movement, allowing installation in as little as 5 minutes. 

Temporary EventBridge pedestrian bridge being positioned over the road by crane during the build-up of the Spring Break event.

The Springbreak Festival in Pouch (DE) is a good example. We have been installing the bridge across the B100 in this way since 2015. To make such a fast installation possible—with only a brief traffic stop in the case of the Springbreak Festival—good preparation is essential. This preparation pays off not only the first time, but especially for recurring projects. At events that take place every year, the entire process becomes increasingly efficient, as the location, planning and working method are already familiar and everyone involved knows exactly what to do.

A Bridge Right in the Middle of a Major Thoroughfare?

With a total setup and removal time of only around 6 hours, EventBridge opens up possibilities that would be difficult to achieve with conventional bridge systems. For events and projects, roads are often already closed several hours in advance. In many cases, both the installation and subsequent removal of the bridge can be carried out within this existing—or, if necessary, slightly extended—time window.

Temporary EventBridge pedestrian bridge positioned in the middle of the road at Place de la Bastille in Paris, during the road closure for the Semi Marathon de Paris.

Temporary EventBridge pedestrian bridge on the Promenade des Anglais in Nice, installed during a temporary road closure for IRONMAN Nice.

This makes it possible to install a pedestrian bridge directly on the road without requiring an additional road closure solely for the installation of the bridge. Good examples are Place de la Bastille in Paris during the half marathon and Promenade des Anglais in Nice during IRONMAN. At both locations, we have been installing our EventBridge directly on the roadway for years. Curious to know whether this could work for your event as well? We would be happy to explore the possibilities at your location, with no obligation.