Efficiently Designed for Temporary Applications

Just 9 components on a single trailer make up a complete bridge. The bridge is height-adjustable and, in its standard configuration, offers a span of 11.3 m at a minimum height of 4.6 m. For temporary solutions, a significant part of the total cost is determined by preparation, transport, installation and removal. This is why efficiency was one of the key considerations from the very beginning of EventBridge’s development. The result: minimal preparation, efficient transport and short installation times, helping to keep both project lead times and overall project costs as low as possible.

Temporary EventBridge pedestrian bridge with a modular design, developed for efficient and cost-effective deployment.

Temporary EventBridge pedestrian bridge being lifted by crane for efficient installation on site.

How does this work with EventBridge?

Preparation Our bridges are already practically ready for deployment on your project.
Transport Each unit has its own trailer and can be connected directly to a truck.
Assembly and dismantling Including crane setup, from 6 hours for assembly and 5 hours for dismantling.

Minimal Use of Personnel and Equipment

Installing an EventBridge requires only two technicians, one truck and one crane. This keeps both personnel and equipment requirements at your location to a minimum—and helps keep the associated costs low. If additional capacity is required by connecting two bridge units, only one additional crew member is needed. For more extensive branding, one or two additional crew members may be required during installation, depending on the sponsor’s requirements and the chosen branding configuration. 

Two EventBridge installers, one truck and one crane during the efficient assembly of a temporary pedestrian bridge.

Cost-effective, temporary EventBridge pedestrian bridge that can be quickly assembled and efficiently deployed on site.

Keeping Project Costs Under Control

Every hour spent on the preparation and execution of a project adds to the overall cost. This applies not only to us, but also to you. Permits need to be arranged, traffic measures coordinated and the installation of the bridge planned and supervised. Thanks to our efficient working method, a standardized construction manual for each bridge, short installation times and minimal manpower requirements, we can help keep the overall project effort—and therefore the costs—as low and predictable as possible. Curious about the possibilities? We would be happy to explore the options for your project.